Private Residence – Des Moines
I was hired to design a backyard course this summer. It’s an awesome property, about 3 acres and about 50′ of elevation change from front to back. There’s a small creek that runs through and lots of hardwood trees. Idyllic. Upon the first visit, I walked the property with the owner to flesh out the … More Private Residence – Des Moines
Don Williams DGC – Phase 1
Work continues at DWDGC. We hope to have 10 holes (1-6, 15-18) playable this Fall with the remaining holes to be completed Spring 2021. The recent derecho storm left the park virtually unscathed, at least where the course runs through. About 70% of the clearing has been completed and baskets are being ordered. Still to … More Don Williams DGC – Phase 1
LaRock DGC – Ames 3M Plant
Phase 1 of the project, consisting of nine holes of a projected eighteen, is under construction. The recent derecho storm knocked a few trees down, but employee volunteers have gotten course about 50% completed, with 8 of the baskets installed and most of the old ball field fencing removed. Still to come are concrete tees … More LaRock DGC – Ames 3M Plant
Follow My Blog
Get new content delivered directly to your inbox.